Projects are the core unit of work in Dashly. Everything - budgets, risk, NPV, milestones, and team assignments - belongs to a project.
Project fields
When creating or editing a project, you can set the following fields:
| Field | Description | Required |
|---|---|---|
| Name | The project title - shown on cards and in all reports. | Yes |
| Owner | The person responsible for the project. Free text - does not have to match a workspace member. | No |
| Details | A longer description of the project scope and objectives. | No |
| Status | Current lifecycle stage. See status definitions below. | Yes |
| Priority | Urgency level: High, Medium, or Low. | Yes |
| Scale | Time horizon: Short-term, Medium-term, or Long-term. | Yes |
| Start Date | When the project officially begins. | No |
| Duration | Expected length in months. | No |
| Budget | Approved or estimated total spend for the project (in your workspace currency). | No |
| Actual Costs | Costs incurred to date - used in cost variance calculations. | No |
| Expected Revenue | Projected revenue or value created by the project. | No |
| Notes | Free-text notes - visible only to workspace members. | No |
Project statuses
Status reflects where the project is in its lifecycle. Choose the one that honestly reflects the current state.
The project exists in Dashly but work has not started. Used for ideation, scoping, or pipeline tracking.
Active planning is underway - defining scope, budget, team, and milestones. Not yet executing.
Execution has started. The project is actively being delivered.
Work has temporarily stopped - due to resource constraints, stakeholder decisions, or external blockers.
The project has been delivered and formally closed. All outputs have been handed over.
The project has been stopped before completion and will not be resumed.
HEALTH IMPACT
Priority levels
Priority signals urgency and resource allocation. It is also factored into the Dashly Sense health score.
| Priority | Meaning |
|---|---|
| High | Requires immediate attention or has strategic significance. Adds 10 pts to health score. |
| Medium | Important but not urgent. Adds 5 pts to health score. |
| Low | Routine or background work. No priority bonus to health score. |
Scale (time horizon)
| Scale | Duration | Meaning |
|---|---|---|
| Short-term | < 6 months | Tactical, quick-to-deliver initiatives. |
| Medium-term | 6 – 18 months | Standard project horizon. Most organisational projects. |
| Long-term | > 18 months | Strategic programmes, infrastructure, or multi-phase initiatives. |
Milestones
Milestones mark key deliverables or checkpoints within a project. They are tracked on the project detail page.
Adding milestones
Open the project detail page and click Add Milestone. Set a name, target date, and optional notes. Toggle it as complete when the milestone is reached.
Milestone progress bar
Project cards show a progress bar when milestones exist. It displays completed/total milestones and fills to the completion colour when all are done.
Linking financial tools
Dashly tools (NPV Calculator, Risk Calculator, Wastage Calculator) can be linked to a project. When you save a calculation and link it, the result is written back to the project and updates the health score.
| Tool | What gets linked | Health impact |
|---|---|---|
| NPV Calculator | NPV value in currency. Positive NPV = strong financial return. | Positive NPV adds up to 30 pts. Negative NPV deducts up to 10 pts. |
| Risk Calculator | Risk score (0–100) and black swan score. | Low risk adds up to 25 pts. High risk (>70) deducts 15 pts. |
| Wastage Calculator | Wastage % and monetary cost of waste. | Feeds into operational health signals in Dashly Sense. |
HOW TO LINK
Project detail page
Click any project card on the dashboard to open the project detail page. The page is split into two columns - the main content column on the left and a context sidebar on the right.
Left column (in order):
- About - project description and internal notes (if set)
- Milestones - full milestone list with completion toggles and progress bar
- Team - assigned members with their workspace roles
- Financials - budget bar, actual costs, budget variance, NPV, and expected revenue
- NPV Sensitivity Analysis - tornado chart (visible when NPV data is linked)
- Risk Decomposition - radar chart and factor breakdown (visible when risk is linked)
- Resource Allocation - allocation chart (visible when resource data exists)
- Notes & Decisions - threaded comments for the project
Right sidebar (always visible):
- Details - Priority, Status, Scale, Duration, Start date at a glance
- Dashly Sense - health score ring, dimension breakdown, and AI recommendations
- Analysis Tools - quick links to NPV Calculator, Risk Calculator, Wastage Calculator for this project
- View in Reports - opens the portfolio reports page
Action bar
The top-right of the project detail page contains the action bar. The primary actions - Share, Edit, and Delete - are always visible. A More button (three dots) reveals secondary actions:
- Share - generate and manage a public read-only link (DASHMASTER and DASHKEEPER only)
- Edit - open the project edit form
- Delete - permanently delete the project (DASHMASTER and DASHKEEPER only)
- More → Save as template - save this project as a reusable company template
- More → Duplicate project - create an identical copy and navigate to it immediately
- More → Export PDF - download a PDF report of the project
Sharing a project publicly
Click Share in the action bar. A panel opens where you can toggle the public link on or off. When enabled, Dashly generates a unique, read-only URL. Anyone with the link can view the project summary without logging in. No Dashly account is required.
IMPORTANT
Bulk operations
On the main dashboard, you can select multiple projects at once using the checkbox that appears when you hover over a card. Once one or more projects are selected, a bulk action bar appears at the bottom of the screen with the following options:
- Change status - update all selected projects to a new status in one action
- Export CSV - download the selected projects as a spreadsheet
- Delete - permanently delete all selected projects (with undo grace period)
Click the X in the bulk action bar, or press Escape, to deselect all projects and dismiss the bar.
Pinning projects
Hover over any project card and click the pin icon to pin it to the top of your dashboard. Pinned projects always appear first, regardless of other sorting. Useful for your most active or critical projects.
Deleting a project
CAUTION
Dashly gives you a 5-second undo window after deletion. A toast notification appears with an Undo button - click it within 5 seconds to restore the project. After that, the deletion is permanent.